Main Contractor
- Excavation to design levels, temporary access roads, temporary rainwater and wastewater draina
250 days
Mo Lao, Ha Dong, Hanoi
* Project scale:
- 11 detached and semi-detached villas (areas from 155m² – 312m²)
- 89 townhouses (areas from 66m² – 231m²)
* Construction package: Construction of foundations, structural works, exterior finishing for 100 units (detached, semi-detached, and townhouses), including technical infrastructure
* Construction start time: January 2019