Golden land building - Nguyen Trai - Ha Noi
General contractor
Construction, equipment supply and installation, and finishing works
24 months
Thanh Xuan, Hanoi
- Project level: Level I
- 03 basements with a total area of 13,200 m²;
- 33 above-ground floors with a total construction area of 63,750 m².
- Construction package:
+ Construction of bored piles, diaphragm walls, and pile caps;
+ Construction of 03 basement levels with a total floor area of 16,800 m²;
+ Construction of the foundation using the semi top-down method;
+ Construction of 33 above-ground floors with a total floor area of 47,600 m²;
+ Equipment supply, installation, and finishing works.
- Construction start time: 11/2017