Construction contractor
Construction of bored piles; reinforced concrete structure for foundation and superstructure; rough construction and basic finishing; fabrication and installation of steel structures; installation o
510 days
Hải Tiến, Hoang Hoa, Thanh Hoa
* Project level: Level I
* Project scale:
- Hotel: 1 basement, 21 floors above ground, total floor area: 41,700 m²
- Commercial Service Center: 4 floors above ground, total floor area: 7,500 m²
* Construction package: Construction of bored piles, reinforced concrete foundation and superstructure, rough construction and basic finishing, steel structures, WC partitions, wooden flooring for hotel apartments, and vinyl flooring for the 5-storey commercial block and 21-storey hotel block.
* Construction start time: July 2022