Main Contractor
Construction; installation of elevator system, telephone network, fire protection system, termite prevention system, and 200kVA standby generator.
Completed in 2014
TT. Tam Đảo, Tam Đảo, Vinh Phuc
- Project scale:
+ Number of basement levels: 01
+ Number of above-ground floors: Block A – 03 floors; Block B – 05 floors
- Construction package: Construction of structural and finishing works, and fire protection system.
- Construction start time: 2013
- Completion: 2014