Consortium Contractor
Package No.19: Construction, procurement, and installation of building equipment and technical systems (excluding medical equipment).
450 days
Thanh Nhan Ward, Hanoi
A. Demolition Works
- Demolition of Building Blocks B–C (5 floors, total area: 5,280 m²);
- Demolition of the 2-storey MRI Building;
- Removal of existing landscape areas.
B. New Construction Works
- Construction of a High-Tech Building with 1 basement and 6 floors above ground (construction area: 1,300 m²);
- Construction of a 2-storey Technical Building (area: 98 m²);
- Construction of a 1-storey Connecting Corridor (area: 113 m²).