UPGRADING HANOI CANCER HOSPITAL – A LEADING HOSPITAL IN CANCER DIAGNOSIS AND TREATMENT

Name of project
Name of project:

Contract type
Contract type:

Consortium Contractor

Construction package
Construction package:

Package No.19: Construction, procurement, and installation of building equipment and technical systems (excluding medical equipment).

Implementation progress
Implementation progress:

450 days

Project location
Project location:

Thanh Nhan Ward, Hanoi

UPGRADING HANOI CANCER HOSPITAL – A LEADING HOSPITAL IN CANCER DIAGNOSIS AND TREATMENT
PROJECT OVERVIEW

PROJECT OVERVIEW

A. Demolition Works

- Demolition of Building Blocks B–C (5 floors, total area: 5,280 m²);

- Demolition of the 2-storey MRI Building;

- Removal of existing landscape areas.

B. New Construction Works

- Construction of a High-Tech Building with 1 basement and 6 floors above ground (construction area: 1,300 m²);

- Construction of a 2-storey Technical Building (area: 98 m²);

- Construction of a 1-storey Connecting Corridor (area: 113 m²).

PHOTOS OF THE PROJECT

PROJECT PROGRESS/RELATED NEWS

Loading...