PTS Joint Venture
Package No. 20 – Construction of the new hospital, demolition of existing structures, and procurement & installation of building equipment
360 days
Tay Ho, Hanoi
* Type of Work: Hospital Construction
* Project level: Level I (in accordance with QCVN 03:2022/BXD)
- Construction of the new main building:
+ 02 basement levels, 12 above-ground floors, 300 hospital beds
+ Total floor area: 41,871 m², including 10,400 m² of basement area and 31,471 m² of above-ground area
- Construction of new technical infrastructure works:
Pumping station, underground water tank, power station, medical gas supply station, internal roads, and parking areas
* Construction package:
- Dismantling and demolition of existing structures (Outpatient, Inpatient and Administration Building; One-story Administration Building; One-story Auxiliary Building; One-story Operation Building; Swimming Pool; Guard House; Gates and Fences)
- Execution of bored piles, foundation structures, basements, superstructure, doors, glass walls, termite prevention, lightning protection, electrical and plumbing systems, medical gas systems, fire protection, pressurization and smoke extraction, low-voltage systems, HVAC, technical infrastructure, and interior equipment installation.