Hoa Phat Dung Quat cast iron and steel Manufacturing compound 2

Name of project
Name of project:

Hoa Phat Dung Quat Steel Joint Stock Company

Contract type
Contract type:

General construction contractor

Construction package
Construction package:

The general contractor for the construction of package 04.03 - warehouse 4# (mixed or

Implementation progress
Implementation progress:

400 days

Project location
Project location:

Dung quat, Binh Sơn, Quang Ngai

Hoa Phat Dung Quat cast iron and steel Manufacturing compound 2
PROJECT OVERVIEW

PROJECT OVERVIEW

- Scale: Hoa Phat Dung Quat 2 Iron and Steel Production Complex Project has a total investment of 85,000 billion VND by Hoa Phat Steel Joint Stock Company; Dung Quat is the investor. Dung Quat 2 project has a scale of over 280 hectares, located next to Hoa Phat Dung Quat 1 Iron and Steel Complex. Design capacity includes 5.6 million tons of hot rolled coil steel (HRC)/year.

- Content of work: Construction of package 04.03 warehouse 4# (Mixed ore warehouse) and package 04.04 - Items at both ends of warehouses 1#, 2#, 3#, 4# and connection items from HPDQ1 to HPDQ2 Raw material factory includes: Ground leveling; Foundation; Structural construction, finishing and other work; Special construction items, deep foundation reinforcement construction, infrastructure construction; Other items as required by the investor

- Construction start: 2022

PHOTOS OF THE PROJECT