General contractor
- Construction of substructure;
660 days
Ha Long, Quang Ninh
- Project level: Level I
- Project scale:
+ 2 basement levels
+ 31 above-ground floors, 2 towers
+ Total construction floor area: 87,820 m²
- Construction package:
+ Construction of substructure;
+ Construction of superstructure, brickwork, plastering, tiling, waterproofing, etc.
- Construction start time: 01/2017