VINHOMES PARK TAY MO – DAI MO URBAN AREA
Main contractor
Package 1: Construction of the common basement structure for lot F3
Package 1: 510 days
Tay Mo, Nam Tu Liem, Hanoi
* Project level: Level I
* Project scale:
- 02 shared basement levels for lots F3-CH04 and F3-P01
- 03 towers of 38 floors each within lot F3-CH04
- Total construction floor area: 148,411.8 m² for lot F3-CH04 (excluding basement)
- Lot F3-P01 is planned as a parking area
* Construction package:
Package 1:
- Construction of 2 shared basement levels for lots F3-CH04 and F3-P01
- Construction of superstructure and external finishing works for Tower V14 (lot F3-CH04)
Package 2:
- Finishing works for Towers V11, V12, and V14 (lot F3-CH04)
* Construction start time: 22/10/2024