General contractor
- Construction of reinforced concrete structure above ±0.00 level, brickwork, and plasteri
300 days
Đống Đa, Hanoi
- Project scale:
+ 1 tower with 27 above-ground floors and 1 rooftop technical floor;
+ Total construction floor area: 30,520 m²;
- Construction package:
+ Construction and finishing of the superstructure;
+ Brickwork and plastering (superstructure);
+ Exterior landscaping;
- Construction start time: 03/2018.