LA HIEN CEMENT PLANT – THAI NGUYEN
PROJECT OVERVIEW

PROJECT OVERVIEW

* Project level: Level I

* Project scale:

- 01 raw material grinding unit (steel structure)

- 01 raw material silo (steel structure)

- 01 clinker silo (steel structure)

- 01 cement silo (steel structure)

* Construction package: Construction of cement silo D=15 m, H=34 m; clinker silo D=15 m, H=47 m

* Construction start time: 2008