Construction Contractor
- Construction of raw material homogenizing silo
2008 – 2011
Dai Tu, Thai Nguyen
* Project scale:
- 01 raw material silo: D=20 m, H=45 m
- 02 cement silos: D=16 m, H=43 m
- 01 clinker silo: D=23 m, H=32 m
- 03 main clinker silos: D=8.5 m, H=16 m
- 04 by-product silos: D=5–8 m, H=16 m
- Heat exchange tower: 14x16 m footprint, 2 concrete floors H=17.125 m, 10 steel structure floors H=123.2 m
* Construction package: + Construction of raw material homogenizing silo
- Construction of kiln support structure
- Construction of clinker silo and conveying system
- Construction of cement silo
- Construction of heat exchange tower
* Construction start time: 2008